* A foreman was checking on a worker that was sandblasting from a 45 foot high tubular welded frame scaffold. More detailed findings from the draft report include the following:. Build-up of ink causes production quality and safety concerns.
0/4000 chars
* A foreman was checking on a worker that was sandblasting from
a 45 foot high tubular welded frame scaffold. More detailed findings
from the draft report include the following:.
Build-up of ink causes production quality and safety concerns.