NB Power is beginning a study to determine the future of its Mactaquac generating station. If the cost of all three options was the same, would you prefer:
The dam remain, but the power plant be decommissioned
The generating station be refurbished and it continue to produce electricity
The dam be removed and allow the river to return to its natural state
Vote
View Results
See this poll on:
https://poll.fm/7461768/embed